Nuclear power station Stade (German: Kernkraftwerk Stade,
KKS) operated from 1972 to 2003 in
Bassenfleth close to the Schwinge-river mouth into the
Elbe river. It was the first nuclear plant shut down after Germany's
nuclear phase out legislation and is currently undergoing the decommissioning process (Phase 2:Deconstruction of larger modules in the containment building).
The station is located at the left bank of the
Elbe next to the city
Stade, to the west of
Hamburg in
Lower Saxony beside another shut down power station
Schilling. The KKS was based upon a
light water reactor.
History
The power plant was built by the
Siemens company and started operation on May, 19th, 1972 shortly after having reached the first
criticality on January, 8th, 1972.
Between March, 1972 and November, 2003 the KKS supplied electrical power of 662MW (internal) resp. 630MW(external), as well as 1892MW thermical power. Until September, 7th, 2005, the power plant ran in "post-operational" mode, since then it's in "residual" mode.
During the 31 years of operation, 157
fuel elements have been consumed, since December, 15th, 1988 also fuel elements containing 4%
uranium. Since 1984, the nearby
saline has been supplied with process steam. This was the first supply of thermical energy by a nuclear power station. On Friday, November 14, 2003, at 8:32 a.m. the Stade nuclear power plant has been shut down. The operating company E.ON officially assigned economical reasons, however, Germany's nuclear phase out act of 2000 surely provided also a political motivation.
Deconstruction
The power plant deconstruction is divided into 5 phases, which shall be completed until 2015.
- Phase 1: Deconstruction of machinery and parts, which are not required for "residual" operation. Preparation of further steps and infrastructure.
- Phase 2: Deconstruction of large components in the containment building
- Phase 3: Deconstruction of the pressure containment building and the biological shield
- Phase 4: Deconstruction of the remaining contaminated parts. Proof of absence of contamination. Release of remaining structures out of governmental nuclear supervision.
- Phase 5: Destruction of conventional structures.
On April, 27th 2005 the last fuel cells have been moved away from the KKS.
Nevertheless, the department of the environment of lower saxony authorized storage of weak nuclear waste until 2046. .
Consequences
After shutdown of the Stade nuclear power plant, the operation of the nearby saline has been shut down also. Only a few years after (2006) the nearby aluminium factory was closed because of too expensive electrical energy. Also, lots of small supplying companies got into trouble.
Meanwhile it's planned to construct a
black coal power plant with almost the same power as the KKS. This requires extension of the harbour of
Stade-Bützfleth with a coal terminal for 1.7 million t black coal.
Further Information
Get more info on 'Stade Nuclear Power Plant'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://stade_nuclear_power_plant.totallyexplained.com">Stade Nuclear Power Plant Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |